Mumbai Metro Line 2A & 7 Station Structures (1,475 MT & 60,000 Sq. Mtr.) — Mumbai Metro (MMRDA)
HOMEPROJECTSMumbai Metro (MMRDA)|Infrastructure (Public & Industrial)

Mumbai Metro Line 2A & 7 Station Structures (1,475 MT & 60,000 Sq. Mtr.)

Mumbai Metro (MMRDA)
Mumbai, Maharashtra
1,475 MT
1,475 MTDocumented ScopeMeasurable Contract Metric
100% PassedQuality InspectionRT / NDT / Pressure Hold
VerifiedClient HandoverIndustrial Commissioning
Triple ISOHSE Compliance9001 • 14001 • 45001 Standards
Project Overview

Execution Scope & Engineering Narrative

Prestigious urban transit infrastructure project executed for MMRDA on Mumbai Metro Lines 2A and 7. Scope covered structural steel fabrication, high-elevation nighttime erection over live municipal roadways, and 60,000 square metres of aerodynamic curved roof sheeting across four elevated stations.

Detailed Scope of Execution

Line 2A & 7: Structure and sheeting work for 4 Nos. Stations
Structure Erection totaling 1,475 MT
High-durability architectural roof sheeting totaling 60,000 Sq. Mtr.

Key QA/QC & Technical Standards

Heavy crane hoisting in dense urban traffic under strict municipal EHS windows
High-strength friction grip (HSFG) structural bolting and alignment
Weather-tight curved architectural station roof cladding
Project Record

Key Technical Data

Client / EmployerMumbai Metro (MMRDA)
Site LocationMumbai, Maharashtra
Industry DisciplineInfrastructure (Public & Industrial)
Measurable Quantities:
Structure Erection:1,475 MT
Station Sheeting:60,000 Sq. Mtr.
Stations Scope:4 Nos. Stations
Transit Lines:Line 2A & Line 7

Verified Record: Executed specifications and measured quantities sourced directly from official corporate engineering dossiers.

Related Portfolio

Other Infrastructure (Public & Industrial) Projects

Additional industrial executions in this sector delivered by our teams.

View All Projects
Substation, RCC Roads, Compound Wall & Plant Works — Suzuki Motors Gujarat Pvt Ltd.
Infrastructure (Public & Industrial)
Facility Type:Automobile Manufacturing Hub
Suzuki Motors Gujarat Pvt Ltd.Becharaji, Gujarat

Substation, RCC Roads, Compound Wall & Plant Works

Turnkey civil infrastructure including substation building and heavy-duty RCC roads for Suzuki Motors Gujarat at Becharaji.

Civil PackageSubstation, Heavy Roads & Compound
ClientSuzuki Motors Gujarat
Structure Fabrication, Piping & Equipment Installation — National Engg. Industries. Ltd. (A Birla Group Co.)
Infrastructure (Public & Industrial)
Parent Group:Birla Group Co.
National Engg. Industries. Ltd. (A Birla Group Co.)Baroda, Gujarat

Structure Fabrication, Piping & Equipment Installation

Integrated mechanical package: steel structures, piping networks, and machinery erection for National Engineering Industries (Birla Group).

DisciplinesStructures, Piping & Equipment
1.4 Lac Sq. Ft. Industrial Logistics Warehouse — Green Impact Realty
Infrastructure (Public & Industrial)
Built-up Footprint:1.4 Lac Sq. Ft.
Green Impact RealtyAhmedabad, Gujarat

1.4 Lac Sq. Ft. Industrial Logistics Warehouse

Complete civil construction of a 1.4 Lac Sq. Ft. state-of-the-art logistics and industrial warehouse facility in Ahmedabad.

DisciplineComplete Civil Construction
Partner With J&H Infra Projects

Let's Build the Future Together.

Have a complex industrial engineering or infrastructure requirement? Connect with our technical leadership to discuss your project specifications and execution schedules.

Corporate Office: Ahmedabad, Gujarat•Fabrication Facility: Fortune North Industrial Estate•Direct: avvyas@jhinfra.in
Quick Enquiry