
Execution Scope & Engineering Narrative
Large-scale industrial PEB structure erection for MRF Ltd. in Tiruchirappalli. The project encompassed the sequential erection, alignment, and calibrated torque tightening of 4,190 metric tonnes of structural steel frameworks, creating extensive production halls for heavy tyre manufacturing.
Detailed Scope of Execution
Key QA/QC & Technical Standards
Key Technical Data
Verified Record: Executed specifications and measured quantities sourced directly from official corporate engineering dossiers.
Other Heavy Industry (Cement, Steel & Copper) Projects
Additional industrial executions in this sector delivered by our teams.

Mundra Greenfield Copper Smelter ASU Plant
Flagship heavy industrial installation: 2,730 MT combined equipment/structural erection plus 30,000 inch-dia cryogenic piping at Adani Kutch Copper Mundra.

Heavy Structures & Coal, Lime & Gypsum Sheds (3,700 MT)
3,700 MT structural fabrication and erection for Ambuja Cements greenfield plant at Marwar Mundwa, including 3,100 MT bulk storage sheds.

73,000 Sq. Mtr. Jetty Covered Dome Shed (120m Span)
Massive coastal jetty round dome shed at JSW Steel Dolvi: 120m span, 55m height, 450m length, and 73,000 sq. m sheeting in marine conditions.
Let's Build the Future Together.
Have a complex industrial engineering or infrastructure requirement? Connect with our technical leadership to discuss your project specifications and execution schedules.