Execution Scope & Engineering Narrative
Major power generation infrastructure contract for L&T Energy-Power Ltd. at Buxar. Work involved workshop fabrication and site erection of structural assemblies and heavy platework for two massive 650 MW supercritical power plant chimney structures.
Detailed Scope of Execution
Key QA/QC & Technical Standards
Key Technical Data
Verified Record: Executed specifications and measured quantities sourced directly from official corporate engineering dossiers.
Other Power Generation & Heavy Engineering Projects
Additional industrial executions in this sector delivered by our teams.

610 NB @ 40 kg/cm² Compressed Gas Pipeline
Critical 610 NB high-pressure compressed gas pipeline operating at 40 kg/cm² tested and commissioned for Ratnagiri Gas & Power (GAIL-NTPC JV).

Switchyard Structures, Transformer Plinths & Control Rooms
Turnkey civil construction of switchyard structures, transformer plinths, and control rooms across all units for Torrent Power.

Workshop Steel Structures for Heavy Vessels
Workshop heavy structural fabrication for nuclear and power vessel assemblies at L&T Hazira complex.